Maney Aircraft, Inc. Purchase Order Supplement Standard Terms and Conditions and Special Quality Clauses

TO BE A SUPPLIER TO MANEY AIRCRAFT, INC. YOU MUST MEET OUR STANDARD QUALITY REQUIREMENTS LISTED BELOW.

Standard Quality Requirements

A. Competence, Awareness and Communication: Suppliers shall ensure that its personnel have the
required training, competence and experience appropriate with the requirements necessary for the
performance of this Purchase Order. All communications shall be in accordance with Supplier Requests,
Paragraph L. Supplier should also be continuously aware of:

  • Their contribution to product or service conformity.
  • Their contribution to product safety.
  • The importance of ethical behavior.

B. Quality System: You must have a documented quality system. You are required to have a quality
system in place that conforms to MIL-I-45208 or a higher standard. Manufacturers of material used in
production manufacturing at Maney Aircraft, Inc., should maintain a third-party certification of your quality
system to these standards, or have a goal to achieve third-party certification, unless exempted by Maney
Aircraft, Inc. in writing.

C. Right of Access: You must allow on-site verification of your quality management system,
manufacturing process, and product by Maney Aircraft, Inc., our customer, our customer’s representative, or
the government (FAA, DOD, etc.), if requested.

D. Material and Process Specifications: You must produce Maney Aircraft, Inc. products to the
specific material and process specifications referenced on the drawing or purchase order unless otherwise
specified in writing.

E. Conflicting Technical Requirements: In the event of conflicting technical requirements, the order of
priority you should follow is the purchase order, the drawing, and then all specifications. You must bring all
conflicting requirements to the attention of Maney Aircraft, Inc. as soon as possible.

F. Supply Chain Management: You must be willing to identify and manage your entire supply chain
which includes ongoing monitoring of sub-contractor quality and delivery performance. It is your
responsibility to ensure that Maney Aircraft, Inc. requirements are met by all your subcontractors used in the
entire manufacturing process.

G. Approved Sources: Some special processes such as heat treatment, plating, NDT, etc. must be
performed by a Maney Aircraft, Inc. approved processor, NADCAP approved processor, or processor
approved by Maney Aircraft’s, Inc. customer and will appear on the purchase order when this applies.

I. Managing Change: You must notify the Maney Aircraft, Inc. buyer of any intended significant changes
to your process, methods, material, or product and obtain our approval prior to implementation. You must
also make this a condition to your entire supply chain. Samples and documentation may be required as part of
the approval process.

J. Mercury Contamination: Material furnished must not contain functional mercury in any form and
must be free from contamination by presence of mercury.

K. Traceability and Serialization: Product traceability is a requirement. You must provide unique
identification of product batch number, lot number, or, if required by the drawing, serial number. The batch,
lot, or serial number must be traceable to all raw material, manufacturing, and inspection records. If raw
material is supplied by Maney Aircraft, Inc. you must assure that parts supplied are traceable by lot number or
serial number to the raw material heat code or Maney Aircraft, Inc. assigned traceability number. If items
supplied by Maney Aircraft, Inc. are serialized, you must assure that traceability is maintained during
processing. If parts are serialized, you must provide with each shipment a list of the serial numbers in the
shipment (either on the packing slip or on an attached sheet).

L. Inspection:

(1) FAR 52.246-2 Inspection of Supplies Fixed Price (Aug 1996)

(2) Product shall be inspected to the degree necessary to ensure compliance with all requirements.
Industry recognized sampling plans such as ANSI/ASQ Z1.4 with AQL 1.0 except accept on zero
defects or inspect per clause 011 if indicated on the purchase order.

M. Supplier Requests: You must submit all Supplier Requests to Maney Aircraft, Inc. in writing.
Supplier Requests shall be submitted for the following (but are not limited to):

  • Technical clarification of Maney Aircraft, Inc. drawings or Maney Aircraft, Inc. customer drawings.
  • Requests for engineering changes (i.e., drawings, specifications).
  • Non-conformance waiver.
  • Permission to borrow Maney Aircraft, Inc. measurement and test equipment.
  • Requests for repair.
  • Use of laser marking.
  • Approval of process specific techniques, plans, or procedures.

N. Maney Supplied Test and Measure Equipment: You must return any borrowed equipment to
Maney Aircraft at least one week prior to the calibration due date. You are not authorized to perform
calibration on Maney Aircraft owned equipment. Return all equipment to the attention of the
“Gauge Lab”. Standard gauges, such as thread gages, plug gages, dial bore gages, variable pitch diameter
gages, (tri-roll) should be purchased and maintained by the supplier. Supplier must review and address these
needs before accepting a Maney Aircraft, Inc. purchase order.

O. Non-Conforming Product: You must only ship product that meets all requirements, or obtain a
written deviation via a Supplier Request prior to shipment of any non-conforming product. If a Supplier
Request is approved, reference the Supplier Request number on the shipping documents and attach a copy of
the approved Supplier Request. Final material acceptance will depend on the actual verification of the non-
conformance and product approval at Maney Aircraft, Inc. If you have reason to believe non-conforming
material may have been inadvertently shipped, contact your Buyer immediately.

P. Corrective Action: In the event of a non-conformance related to your product, you must complete a
written corrective action report addressing the problem definition, containment action, root cause
determination, corrective action plan/contingency actions, implementation timing, and
system/practice/procedure changes to prevent recurrence. You will be required to submit your corrective
action report(s) to Maney Aircraft, Inc.

Q. Shipment and Packaging Requirements: You must comply with all requirements for shipping,
packaging and labeling. In the absence of specific requirements, suitable protection from corrosion,
contamination and handling damage during transit and while in storage at Maney Aircraft, Inc. shall be
provided. Examples of protected surfaces are those surfaces which are completely anodized, plated,
passivated, or painted.

(1) The corrosion resistant 2000 & 6000 aluminums, 200, 300, and PH stainless steels, and all titanium
alloys may be packaged without special provisions for corrosion protection (does not apply to 303Se
or other free machining varieties – package according to (2) below).

(2) All other components/assemblies with any unprotected surfaces must be packaged within a volatile
corrosion inhibitor (VCI) bag. Do not oil parts prior to placing them in VCI bags, as this combination
appears to assist in the initiation of surface corrosion. Do not use VCI bags on Zn-plated parts.

(3) For the more corrosion-prone metals, such as 4XXX alloy steels, and 7XXX aluminum alloys;
application of a non-volatile, corrosion protecting oil followed by packaging in non-porous plastic
bags may be performed in lieu of packaging in VCI bags. This provides additional corrosion
protection as compared to packing in VCI bags alone, and is recommended, especially when time in
transit or storage is expected to be long.

(4) Regardless of the packing technique, do not allow water-soluble cutting fluid residue to accumulate
and dry on any metal (especially aluminum alloys) at any stage of the manufacturing process, in
packaging, and so forth. This is a known cause of corrosion and should always be avoided.

R. ESD Sensitive Items: When packaging materials that are sensitive to damage from electrostatic
discharge (ESD), you must use ESD protective containers or bags. Identify each container or bag with an
ESD warning label and label the external shipping package “Contains Static Susceptible Item” or equivalent.

S. Age Control: You must assure that any items provided which have shelf life limitations, have at least
5/6 of the shelf life remaining at time of shipment.

T. Certification: Unless otherwise specified by clause 013 on the purchase order, you should submit all
applicable certifications (raw material, special process, etc.) and certified test reports for each shipment.
Certifications must be in English, or translated to English. Translations must include the name, title, and
signature of the authorized representative of the company making the translation. Certifications and certified
test reports may include the following information:

  • Name/address of facility that manufactured the material, or performed the process or test
  • Maney Aircraft, Inc. Purchase Order Number
  • Maney Aircraft, Inc. Part Number
  • Maney Aircraft, Inc. Customer Part Number, revision and contract number, when it appears on the PO or Drawing
  • Maney Aircraft, Inc. Drawing Number and Revision, Process performed or material provided, including type/class/grade, as applicable
  • Specification number and revision, if applicable
  • Quantity accepted/rejected (for Certified Test Reports)
  • Quantity shipped
  • Date shipped
  • Name and/or title of authorized representative from the company that manufactured the material, or performed the process or test. For suppliers who utilize electronic signatures, the Quality Manager title is sufficient.
  • Unique traceability number (certification number, heat code number, batch number, melt number,
  • etc.)
  • Part serial numbers, if applicable.
  • Statement certifying that articles covered by the certification are in compliance with the applicable purchase order, drawing and specification requirements.

U. Records: You must maintain production and quality-related records for a minimum of ten years from
date of shipment, unless a longer period is specified on the purchase order. When a military or Government
standard is specified, supplier is instructed to use the latest revision issued by governing activity and certify to
that revision level. When a non governmental specification or drawing is supplied by Maney Aircraft, supplier
shall certify to revision level listed on Maney Aircraft supplied engineering documents and destroy and
previous version.

Supplier shall also be responsible for control and retention of records created in connection with Maney
Aircraft issued purchase orders including protection, identification and retrievably. Records shall be destroyed
after the retention period.

V. Rework and Repair: Rework and Repair are distinctly different processes.

Rework: A process where a non-conformance to the drawing, specification, or contract requirement can be
made to conform using processes equivalent to those originally used in the manufacturing of the product.
Suppliers are not required to obtain approval to rework product unless Special Quality Clause 004 is specified
on the Purchase Order, which requires rework approval.

Repair: A process that reduces but does not completely eliminate a non-conformance, or when a process is
used that is NOT equivalent to those originally used in the manufacturing of the product. Suppliers must
obtain prior approval from Maney Aircraft, Inc. via a Supplier Request to perform repair work and to ship
repaired product, due to the still nonconforming condition and/or the repair method used. Reworked/repaired
parts shall be re-inspected using the same methods and equipment that originally identified the non-
conformance, as well as re-inspection of any other features that may have been affected by the rework. For
electronic items that require Acceptance Testing as part of their original quality requirements, the same
Acceptance Testing will be required after rework/repair of the Items. When returning reworked/repaired parts
to Maney Aircraft, Inc., the shipping paperwork must identify that rework or repair was performed and
reference the approved Supplier Request (if applicable). If outside processes were required to be re-processed,
the process certifications must also reflect the rework/repair status of the parts. In some instances, Maney
Aircraft, Inc. may decide to rework or repair supplied product, in which case Maney Aircraft, Inc. will contact
the supplier to discuss the costs of the rework and potential chargeback to the supplier.

W. Control of records: Supplier shall retain verifiable objective evidence of inspection and tests
performed. Distributors of electronic components shall retain records detailing original manufacturers and
associated date code/lot number. Supplier shall maintain all records associated with products produced for a
specified period of time and destroyed at the end of retention period. Unless otherwise specified, this period
shall be ten years.

X. ITAR Controlled: Warning: This document and documents specified herein contain technical data
whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2778, Et Seq), ITAR 22 CFR
120-130 and Executive Order 13637 and is subject to the export restrictions provided therein. Violations of
these export laws are subject to severe criminal penalties. Export of this document and documents specified
herein are subject to U.S. export control laws and regulations. Recipients of this document and documents
specified herein should abide by such laws and regulations, including country specific controls, and control
on use.

Special Quality Clauses

IN ADDITION TO OUR STANDARD PURCHASE ORDER TERMS AND CONDITIONS AND STANDARD QUALITY REQUIREMENTS, SPECIAL QUALITY CLAUSES MAY BE INVOKED ON INDIVIDUAL PURCHASE ORDERS. OUR SPECIAL QUALITY CLAUSES ARE:

These websites may collect data about you, use cookies, embed additional third-party tracking, and monitor your interaction with that embedded content, including tracking your interaction with the embedded content if you have an account and are logged in to that website.

Who we share your data with

Suggested text: If you request a password reset, your IP address will be included in the reset email.

How long we retain your data

Suggested text: If you leave a comment, the comment and its metadata are retained indefinitely. This is so we can recognize and approve any follow-up comments automatically instead of holding them in a moderation queue.

001 –NOT USED

002 –NOT USED


003 –NOT USED

004 -Approval Required – Rework Method: You must submit your rework method for any rework-able
non-conformances occurring on product against this purchase order to Maney Aircraft, Inc for review and
approval prior to starting rework. You must not make any changes to rework method after Maney approval
has been granted without the prior written approval of Maney’s Quality Control department.

005 -Maney Aircraft, Inc. Source Inspection: Maney Aircraft, Inc. source inspection is required prior
to shipment of any item on this purchase order. Contact the Maney Buyer 5 days prior to the time the items
will be ready for inspection.

006 -Maney Aircraft, Inc. Witness of Test: Maney witness of functional testing of the items on this
purchase order is required. Contact the Maney Buyer 5 days prior to the time the items will be ready for
testing.

007 -Customer Source Inspection: First article inspection by Maney Aircraft, Inc. customer is required
prior to shipment from your plant to Maney Aircraft, Inc. Contact your Maney buyer prior to the scheduled
shipment date to arrange the customer inspection. Evidence of customer inspection approval must accompany
the initial shipment to Maney Aircraft, Inc.

008 -Government Source Inspection (GSI): Government QAR may witness testing and or inspection at
your facility. Upon receipt of this order, promptly notify the Government Representative who normally
services your plant so that the appropriate planning for government inspection can be accomplished. Notify
Maney Aircraft purchasing immediately if GSI testing/inspection impacts your purchase order delivery
schedule.

009 -Drop Shipment: Maney Aircraft, Inc. furnished material (i.e.: castings, forgings, or raw stock) will
be drop shipped to you under this purchase order. Upon receipt of the material, you must assure that all test
reports and certifications required by the applicable specifications have been received and that all
requirements have been met. When shipping finished items to Maney Aircraft, Inc., include these test reports
and certifications with the shipment.

010 -Submit Supplier Inspection Report: You must provide inspection results with each shipment. For
each characteristic inspected, provide the characteristic, the quantity inspected, and quantity
accepted/rejected. Report actual results obtained by inspection of product.

011 -100% Inspection Required: You must perform 100% inspection of all parts and of all drawing
characteristics and drawing notes.

012 -Assembly Contains Classified Part(s): This purchase order is for an assembly that contains
“primary”, “critical”, or “flight safety” part(s).

013 -Certifications-Maintain at Supplier: Certifications are to be submitted with the First Article
Inspection Report (FAI) only. After FAI approval, you must maintain all applicable certifications for
subsequent shipments at your facility for the entire record retention period. You should store certifications so
that they can be retrieved and submitted to Maney Aircraft, Inc. within the time frame requested.

014 -Certification Required – Metallic/Non-Metallic Raw Material: Requires submission of
Certificate of Conformance (C of C) to material specification and/or verification of material part number, as
supplied by Maney Aircraft, Inc. Submit certification with each shipment unless specified on the PO.

015 -Certification Required – Heat Treat: Submit certification with each shipment unless specified on
the PO. Use Maney Aircraft, Inc. Certificate must include mechanical properties.

016 -Certified Test Report – Hardness Testing: Submit test report with each shipment unless specified
on the PO. Certificate must include test method, high and low values, and sample size.

017 -Certification Required – Other: Submit certification, as required per in the PO comments or
drawing notes, with each shipment unless specified on the PO.

018 -Certified Test Report – Non Metallic Material: Submit material test report with each shipment
unless clause specified on the PO. Include actual results of all testing required by specification for each lot of
material furnished. Suppliers of chemical materials must include expiration date and storage conditions
(production date is optional).

019 -Quality System Registration Required: You must maintain third party registration, to an industry
standard i.e. AS9100, ISO 9001, FAA etc. to meet Maney Aircraft, Inc. eligibility requirements.

019A -Higher Level Quality System Required: You must maintain a quality system that is compliant to
the requirements of AS9100, ISO 9001:2008, FAA or equivalent to meet Maney Aircraft, Inc. eligibility
requirements for this purchase order. If any portion of this order is subcontracted; prior written approval is
required from Maney Aircraft, Inc. and flow down of this clause is mandatory.

020 -Submit First Article per AS9102: First article inspection report(s) must accompany the first article
part(s) and be submitted on form SAE AS9102 prior to shipment of production parts.

021 -Age Control – Cure Date: You must maintain cure date control in accordance with SAE-AS1933.
No articles shipped to Maney Aircraft, Inc. shall have a cure date over four quarters at time of receipt unless
specified on the purchase order. All articles must be appropriately marked with the cure date.

100 -Preference for Domestic Specialty Metals (DFARS 252.225-7014 ALTERNATE I):

101 -Qualifying Countries: (See FAR/DFAR regulations for full text)

  • DFARS 252.225-7002 – Qualifying Country Sources As Subcontractors
  • DFARS 225.872-1 – Contracting With Qualifying Country Sources
  • DFARS 225.871-4 – Individual Determinations

200 -FAR/DFARS Flow Down: Maney Aircraft, Inc. FAR / DFARS Flow downs for Commercial
Items (12/04) or Maney Aircraft, Inc. FAR / DFARS Flow downs for Non-Commercial Items (12/04) apply to
this order.

400 –DFARS 252.225-7001 Buy American and Balance of Payments Program – BASIC – US
Material Only: Purchase Order
is for parts that are covered by 49 CFR Part 661 and 49 U.S.C. 5323(j),
BUY AMERICAN REQUIREMENTS_SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982, AS
AMMENDED. The addition of this clause 425 requires Material certifications (clause 120) to specify country
of origin of the material or any country where re-melting occurred.